Namibia: Nekundi tells RA to speed up Aris River bridge replacement – News

Namibia: Nekundi tells RA to speed up Aris River bridge replacement – News

Africa Links 24 with Namibia Press Agency
Published on 2025-03-25 17:00:00

Minister of works and transport Veikko Nekundi yesterday asked the Roads Authority (RA) to consider applying for emergency procurement to repair the Aris River bridge which collapsed last week after heavy rain.

The collapsed bridge left Rehoboth residents who commute to Windhoek stranded.

The bridge on the B1 national highway, located 30km south of Windhoek, was severely damaged by flash floods caused by heavy rains.

Nekundi said the bridge could not be repaired and that it must be…

Read the Full article on The Namibian

Previous articleNigeria: Lack of quality education breeds poverty, inequality, insecurity — Sanwo-Olu
Next articleKenya: KUCCPS Outlines Eligibility Criteria for Placement and Minimum Requirements