Home Africa Ghana: Roads minister gives contractor two months to improve performance on Bediako...

Ghana: Roads minister gives contractor two months to improve performance on Bediako Junction to Camp 15 to Sefwi Adabokrom road project

Ghana: Roads minister gives contractor two months to improve performance on Bediako Junction to Camp 15 to Sefwi Adabokrom road project

Rédaction Africa Links 24 with Ghanaian Times
Published on 2026-04-27 14:50:54

The Minister for Roads and Highways, Kwame Governs Agbodza, has issued a two-month ultimatum to Delovely Construction Ltd. to improve work on the Bediako Junction to Camp 15 to Sewi Adabokrom road project or risk losing the contract.

He gave the directive during an inspection of the 55-kilometre project today, expressing disappointment in the slow pace of work.

According to him, the contractor has completed less than two per cent of the project, even though work should have reached about 20…

Read the Full article on Ghanaian Times

Previous articleGambia: GNLSA Launches Digital Research Centre in Brikama to Boost Access to Information –
Next articleNigeria: Any govt that fails to secure lives has lost right to exist – Obasanjo — Africa Links 24